Picture a $120 million manufacturer building a quoting tool with an outside team: six people, time and materials, a plan estimated in the spring.
By summer the team writes most of its code with AI assistants. A task that took a day now takes an afternoon. The monthly invoice is the same as it was in March.
Nobody is cheating. The plan said six people for nine months, so six people are staffed for nine months, and the hours get logged against the plan.
The speed-up is real. It just has nowhere to go except into the team's margin, or into scope that quietly grows to fill the time.
I've priced these deals from the vendor's side for most of my career, and the mechanism is simple: time and materials bills effort, and effort is the one thing the buyer can't see. You see hours logged. You never see how long the work actually took.
Three tells that you're paying for the plan, not the work
- Your invoices look the same as they did before your partner's team started using AI every day.
- The plan was estimated before that, and nobody has re-estimated it since.
- Ask how many hours the last comparable feature took, and you get the hours logged, not the hours it needed.
Why the usual fix stalls
The obvious move is a fixed price: if they're faster, let them carry the risk. But a fixed price on work nobody has proven gets priced with a contingency big enough to cover everything nobody knows yet.
You haven't captured the speed-up. You've moved the padding from the timesheet into the quote, and paid it up front.
Outcome-based pricing fails the same way. It needs a baseline, and on a new build nobody has measured one, so the outcome gets defined loosely and argued about later.
Both fixes stall for one reason: the price is set before anyone knows how much work there really is.
The working fix
You don't need a better billing model. You need to know the work before you price it.
- Pay a small fixed fee to see it working first. A working slice, on your own data, in days. It turns the estimate into a measurement: how hard the data is, where the integration bites, how fast this team really moves with AI.
- Then fix the price on what you saw. A build priced from a working proof carries a small contingency, because most of the unknowns are already known.
- Pay for things that work, not for time. Price by what goes live (the process running, the integration connected, the report replaced), with a working demo every week, so progress is something you watch rather than read.
- Write the speed-up into the run. When the build is live and the work becomes support, agree that the monthly price is reviewed as the effort falls, and share what comes off.
- Keep the hourly model for what really can't be scoped, like open exploration, with a cap and a date.
The second line is cheaper, but that isn't its main point. It stops climbing early because the thing is live by month five, and after that you're paying for support on a system that works, not for a team still working through a plan.
The billable hour was a fair way to buy work when nobody could see how long the work took. AI made the work faster and left the hour where it was.
A growing company doesn't need to win that argument with its partners. It needs to stop buying the thing that hides the answer.